- Public Inquiry for Land West of Stapleford Lane Stapleford Nottinghamshire
-
- Planning Applications & Advice
- Submit a Planning Application
- Find A Planning Application
- Appeals
- Planning Enforcement
- Planning Policy
- Building Regulations
- Dangerous Structures or Demolitions
- Street Naming & Numbering
- Conservation Areas
- Listed Buildings
- Planning Privacy Notice
- Housing Delivery Plan
- Footpath Diversion Orders
Public Inquiry for Land West of Stapleford Lane Stapleford Nottinghamshire
The Planning Inspectorate have received an appeal against non-determination of a planning application) submitted to us relating to land west of Stapleford Lane.
The appeal is by Bloor Homes Limited relating to the application to Broxtowe Borough Council for “Outline Planning Application for the construction of a residential development of up to 420 residential dwellings and associated open space and infrastructure (With some matters reserved). The proposed development is classified as EIA development under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017”.
The Secretary of State has appointed a Planning Inspector and the Inquiry will open at 10am on Tuesday 25 August and will be held at the Council Offices on Foster Avenue. It is expected that the Inquiry will last for 6 days.
Appeal Details
- Planning Inspectorate Reference: 6006412
- Planning Inspectorate Case Officer: Rodwell St Clair · Email: Rodwell.StClair.2H@planninginspectorate.gov.uk
- Phone: 0303 444 5644
- Planning Application Reference: 25/00371/OUT
Document File Library
Some of the documents below may not be fully accessible, due to being produced by third parties. If you require any assistance with any of the documents, please email pabc@broxtowe.gov.uk or contact the Duty Planner. The Duty Planner is available between 10.30am and 12.30pm, Monday to Friday (Tel: 0115 9177777 and ask to speak to the Duty Planner).
1. CD1 Application Documents and Plans
- 1.01 - Application Form (Opens in a New Window)
- 1.02 - Site Location Plan (Opens in a New Window)
- 1.03 - Illustrative Masterplan (Opens in a New Window)
- 1.04 - Parameters Plan (Opens in a New Window)
- 1.05 - Illustrative Landscape Masterplan (Opens in a New Window)
- 1.06 - Planning Statement (Opens in a New Window)
- 1.07 - Design and Access Statement (Opens in a New Window)
- 1.08 - Statement of Community Involvement (Opens in a New Window)
- 1.09 - Sustainability & Energy Report (Opens in a New Window)
2. CD2 Submitted Environmental Statement
*please note - (A) = Appendices and (F) = Figures
- 2.01 - Environmental Statement Cover (Opens in a New Window)
- 2.01.1 - (A) Environmental Statement Contents (Opens in a New Window)
- 2.02 - Chapter 1 Introduction (Including Appendix) (Opens in a New Window)
- 2.02.1 - (A) EIA Statement of Expertise (Opens in a New Window)
- 2.02.2 - (F) Figure 1.1 – Site Location Plan (Opens in a New Window)
- 2.03 - Chapter 2 Assessment Scope and Methodology (Opens in a New Window)
- 2.03.1 - (A) Summary of Toton North Scoping (Opens in a New Window)
- 2.03.2 - (A) Broxtowe Borough Council EIA Scoping Opinion Toton North (Opens in a New Window)
- 2.04 - Chapter 3 The Site (Opens in a New Window)
- 2.05 - Chapter 4 Proposed Development and Alternatives (Opens in a New Window)
- 2.05.1 - (F) Figure 4.1 – Parameter Plan (Opens in a New Window)
- 2.05.2 - (F) Figure 4.2 – Illustrative Masterplan (Opens in a New Window)
- 2.06 - Chapter 5 Socioeconomics and Health (Opens in a New Window)
- 2.06.1 - (A) Health Impact Assessment (Opens in a New Window)
- 2.06.2 - (F) Figure 6.1 – Site Location Plan (Opens in a New Window)
- 2.06.3 - (F) Figure 6.2 – Planning Designations (Opens in a New Window)
- 2.06.4 - (F) Figure 6.3 – Topography (Opens in a New Window)
- 2.06.5 - (F) Figure 6.4 – Landscape Character (Opens in a New Window)
- 2.06.6 - (F) Figure 6.5 – ZTV Viewpoint Locations and PRoW (Opens in a New Window)
- 2.06.7 - (F) Figure 6.6 – VP’s (Opens in a New Window)
- 2.06.8 - (F) Figure 6.7 – Combined ZTV (Opens in a New Window)
- 2.07 - Chapter 6 Landscape and Visual Amenity (Appendices and Figures) (Opens in a New Window)
- 2.07.1 - (A) Landscape and Visual Effects Methodology (Opens in a New Window)
- 2.07.2 - (A) Landscape Sensitivity (Opens in a New Window)
- 2.08 - Chapter 7 Biodiversity (Opens in a New Window)
- 2.08.1 - (A) Ecological Appraisal (Opens in a New Window)
- 2.08.2 - (A) Biodiversity Net Gain Statement (Opens in a New Window)
- 2.08.3 - (A) Bird Report (Opens in a New Window)
- 2.08.4 - (A) Arboricultural Impact Assessment (Opens in a New Window)
- 2.08.5 - (F) Figure 7.1 - Consultation Plan Designated Sites (Opens in a New Window)
- 2.08.6 - (F) Figure 7.2 - Consultation Plan Species Results (Opens in a New Window)
- 2.08.7 - (F) Figure 7.3 – Baseline Habitats (Opens in a New Window)
- 2.09 - Chapter 8 Cultural Heritage (Opens in a New Window)
- 2.09.1 - (A) Technical Heritage Baseline (Opens in a New Window)
- 2.10 - Chapter 9 Transport and Access (Opens in a New Window)
- 2.10.1 - (A) Transport Assessment (including Access Drawings) (Opens in a New Window)
- 2.10.2 - (A) Framework Travel Plan (Opens in a New Window)
- 2.11 - Chapter 10 Air Quality (Opens in a New Window)
- 2.11.1 - (A) Air Quality Appendices (Opens in a New Window)
- 2.11.2 - (F) Figure 10.1 – Existing Sensitive Human Receptors (Opens in a New Window)
- 2.12 - Chapter 11 Noise and Vibration (Opens in a New Window)
- 2.12.1 - (A)Summary of Background Noise Survey (Opens in a New Window)
- 2.12.2 - (A)Noise Assessment Report (Opens in a New Window)
- 2.12.3 - (A) Road Traffic Data (Opens in a New Window)
- 2.13 - Chapter 12 Flood Risk and Drainage (Opens in a New Window)
- 2.13.1 - (A) Flood Risk Assessment and Drainage Strategy (Opens in a New Window)
- 2.13.2 - (A) Flood Risk Assessment and Drainage Strategy Appendices (Opens in a New Window)
- 2.14 - Chapter 13 Contaminated Land / Ground Conditions (Opens in a New Window)
- 2.14.1 - (A) Phase 1 Ground Assessment (Opens in a New Window)
- 2.15 - Chapter 14 Soils and Agricultural Land (Opens in a New Window)
- 2.15.1 - (F) Figure 14.1 – Agricultural Land Classification (Opens in a New Window)
- 2.16 - Chapter 15 Climate Change (Opens in a New Window)
- 2.16.1 - (A) Steps Involved in CCR Assessment (Opens in a New Window)
- 2.16.2 - (A) Climatic Variables Considered for Each Receptor (Opens in a New Window)
- 2.16.3 - (A) Legislation, Policies and Agendas Context (Opens in a New Window)
- 2.16.4 - (A) Summary of Local, Regional and National GHG Emissions (2020) (Opens in a New Window)
- 2.16.5 - (A) Assessment of Resilience of the Proposed Development to Climate Change (Opens in a New Window)
- 2.16.6 - (F) Figure 15.1 – IEMA Best Practice (Opens in a New Window)
- 2.16.7 - (F) Figure 15.2 – Local Temps (Opens in a New Window)
- 2.16.8 - (F) Figure 15.3 – Wild Rose (Opens in a New Window)
- 2.17 - Chapter 16 Lighting (Opens in a New Window)
- 2.17.1 - (A) Lighting Strategy (Opens in a New Window)
- 2.17.2 - (A) Lighting Baseline Assessment (Opens in a New Window)
- 2.17.3 - (A) Lighting Receptor Locations (Opens in a New Window)
- 2.18 - Chapter 17 Summary (Opens in a New Window)
- 2.19 - Chapter 18 Glossary (Opens in a New Window)
- 2.20 - Chapter 19 References (Opens in a New Window)
3. CD3 Post Submission Documents
- 3.01 - Site Location Plan (24th December 2025) (Opens in a New Window)
- 3.02 - Site Location Plan (Aerial) (24th December 2025) (Opens in a New Window)
- 3.03 - Illustrative Masterplan (24th December 2025) (Opens in a New Window)
- 3.04 - Parameter Plan (24th December 2025) (Opens in a New Window)
- 3.05 - Planning Statement Addendum (24th December 2025) (Opens in a New Window)
- 3.06 - Design and Access Statement (24th December 2025) (Opens in a New Window)
- 3.07 - Preliminary General Arrangement Sheet 1 (24th December 2025) (Opens in a New Window)
- 3.08 - Preliminary General Arrangement Sheet 2 (24th December 2025) (Opens in a New Window)
- 3.09 - Transport Assessment Update (16th February 2026) Part 1 (Opens in a New Window) and Part 2 of document (Opens in a New Window)
- 3.10 - Post-Application Technical Note 003 - Highways Response to Consultee Comments (17th April 2026) Part 1 (Opens in a New Window), Part 2 of document (Opens in a New Window) and Part 3 of document (Opens in a New Window)
- 3.11 - Post-Application Technical Note 004 - Highways Response to Additional Consultee Comments (24th June 2026) (Opens in a New Window)
- 3.12 - Toton Development Strategic Assessment Technical Note - Area of Influence Calibration & Validation Assessment (23rd October 2025) (Opens in a New Window)
- 3.13 - Toton Development Strategic Assessment Technical Note – Reference Case Assumptions (13th November 2025) (Opens in a New Window)
- 3.14 - Toton Development Strategic Assessment Technical Note – Reference Case Report (27th February 2026) (Opens in a New Window)
- 3.15 - Original Toton Development Strategic Assessment Technical Note – Toton Strategic Modelling Report – Scenario 3 (19th May 2026) (Opens in a New Window)
- 3.16 - 1st Revision to Toton Development Strategic Assessment Technical Note – Toton Strategic Modelling Report – Scenarios 1 and 3 (15th July 2026) (opens in a New Window)
- 3.17 - 2nd Revision to Toton Development Strategic Assessment Technical Note – Toton Strategic Modelling Report – Scenarios 1, 3 and 4 (15th July 2026) (Opens in a New Window)
4. CD4 Environmental Statement Addendum
- 4.01 - ES Addendum Text and Figures (December 2025) (Opens in a New Window)
- 4.02 - (A) 7.4 - Arboricultural Assessment (Opens in a New Window)
- 4.03 - (A) 7.5 – Spring Bat Data (Opens in a New Window)
- 4.04 - (A) 7.6 – Supplemental Breeding Bird Report (Opens in a New Window)
- 4.05 - (A) 7.7 – BNG Report (Opens in a New Window)
- 4.06 - (A) 9.1- Transport Assessment (Opens in a New Window)
- 4.06.1 - (A) Transport Assessment Appendices A-D (Opens in a New Window)
- 4.06.2 - (A) Transport Assessment Appendices E-G (Opens in a New Window)
- 4.06.3 - (A) Transport Assessment Appendices H – I (Opens in a New Window)
- 4.07 - (A) 9.2 - Framework Travel Plan (Opens in a New Window)
- 4.08 - (A) 9.3 - Study Area (Opens in a New Window)
- 4.09 - (A) 9.4 – 2025 Baseline Scenario Traffic Data (Opens in a New Window)
- 4.10 - (A) 9.5 – Assessment of Construction Traffic Impacts (Opens in a New Window)
- 4.11 - (A) 9.6 – Future Year Scenario Traffic Data and Assessment of Operational Traffic Impacts (Opens in a New Window)
- 4.12 - (A) 12.2 – Flood Risk Assessment and Drainage Strategy Addendum (Opens in a New Window)
- 4.13 - Environmental Statement Non – Technical Summary (Opens in a New Window)
5. CD5 Statutory Consultee Responses
- 5.01 - Broxtowe Borough Council’s Housing Services and Strategy Manager (3rd June 2025) (Opens in a New Window)
- 5.02 - Environment Agency (3rd June 2025) (Opens in a New Window)
- 5.03 - The Coal Authority Planning Team (3rd June 2025) (Opens in a New Window)
- 5.04 - Nottingham County Council Highways (3rd June 2025) (Opens in a New Window)
- 5.05 - Natural England (9th June 2025) (Opens in a New Window)
- 5.06 - VIA in Partnership with Nottinghamshire County Council Rights of Way Officer (17th June 2025) (Opens in a New Window)
- 5.07 - NHS Nottingham and Nottinghamshire ICB (17th June 2025) (Opens in a New Window)
- 5.08 - Broxtowe Borough Council Environment (Bins) Officer (17th June 2025) (Opens in a New Window)
- 5.09 - National Highways (18th June 2025) (Opens in a New Window)
- 5.10 - Nottinghamshire County Council Lead Local Flood Authority (19th June 2025) (Opens in a New Window)
- 5.11 - Active Travel England (20th June 2025) (Opens in a New Window)
- 5.12 - Environmental Health Officer (23rd June 2025) (Opens in a New Window)
- 5.13 - Nottinghamshire County Council Policy Response (24th June 2025) (Opens in a New Window)
- 5.14 - Nottingham County Council Travel Plan (30th June 2025) (Opens in a New Window)
- 5.15 - Chetwynd: Toton and Chilwell Neighbourhood Forum Covering Letter (3rd July 2025) (Opens in a New Window)
- 5.15.1 - Chetwynd: Toton and Chilwell Neighbourhood Forum NP Assessment (3rd July 2026) (Opens in a New Window)
- 5.15.2 - Chetwynd: Toton and Chilwell Neighbourhood Forum Response to Public Consultation (Opens in a New Window)
- 5.16 - Network Rail (10th July 2025) (Opens in a New Window)
- 5.17 - Firstplan on behalf of DB Cargo Ltd (31st July 2025) (Opens in a New Window)
- 5.18 - The Coal Authority (13th January 2026) (Opens in a New Window)
- 5.19 - Cadent Gas (19th January 2026) (Opens in a New Window)
- 5.20 - National Highways (28th January 2026) (Opens in a New Window)
- 5.21 - Active Travel England (2nd February 2026) (Opens in a New Window)
- 5.22 - Nottinghamshire Council Policy Response (5th February 2026) (Opens in a New Window)
- 5.23 - Active Travel England (9th February 2026) (Opens in a New Window)
- 5.24 - Network Rail (12th February 2026) (Opens in a New Window)
- 5.25 - National Highways (28th April 2026) (Opens in a New Window)
- 5.26 - Active Travel England (19th May 2026) (Opens in a New Window)
- 5.27 - Nottinghamshire County Council (4th June 2026) (Opens in a New Window)
- 5.28 - National Highways (15th June 2026) (Opens in a New Window)
- 5.29 - Chetwynd: Toton and Chilwell Neighbourhood Forum Additional Representations (24th February 2026) (Opens in a New Window)
- 5.30 - Broxtowe Borough Council Conservation & Green Space Development Manager comments (21 May 2026) (Opens in a New Window)
- 5.31 - Broxtowe Borough Council Parks and Green Space Manager comments 12 August 2026) (Opens in a New Window)
6. CD6 The Development Plan
- 6.01 - Broxtowe, Gedling and Nottingham Aligned Core Strategies Part 1 Local Plan (2014) (Opens in a New Window)
- 6.02 - Broxtowe Borough Council Local Plan Part 2 2018-2028 (October 2019) (Opens in a New Window)
- 6.03 - Chetwynd: The Toton and Chilwell Neighbourhood Plan 2020 - 2040 (May 2024) (Opens in a New Window)
- 6.04 - National Planning Policy Framework (December 2024) (Opens in a New Window)
- 6.05 - Broxtowe Borough Council Local Plan Part 2 Infrastructure Delivery Plan (July 2017) (Opens in a New Window)
- 6.06 - The East Midlands Regional Plan (2009) the Regional Spatial Strategy (Opens in a New Window)
- 6.07 - Broxtowe Local Plan Part 2, Report of the Examination (Opens in a New Window)
- 6.08 - Greater Nottingham Aligned Core Strategy, Report of the Examination (Opens in a New Window)
7. CD7 Supplementary Planning Document
- 7.01 - Toton and Chetwynd Barracks Strategic Masterplan Supplementary Planning Document (February 2023) (Opens in a New Window)
8. CD8 Emerging Development Plan
- 8.01 - Greater Nottingham Strategic Plan Publication Draft (March 2025) (Opens in a New Window)
- 8.02 - Greater Nottingham Strategic Plan Infrastructure Delivery Plan (September 2024) (Opens in a New Window)
- 8.03 - Greater Nottingham Strategic Plan Infrastructure Delivery Plan Addendum (November 2025) (Opens in a New Window)
- 8.04 - Greater Nottingham Aligned Core Strategy, Report of the Examination (Opens in a New Window)
- 8.05 - Greater Nottingham Strategic Plan Main Modifications (Tracked Version) (Opens in a New Window)
9. CD9 Appeal Documents
- 9.01 - First Case management Conference Agenda (15th June 2026) (Opens in a New Window)
- 9.02 - First Case Management Conference Inspectors Note (15th June 2026) (Opens in a New Window)
- 9.03 - Strategic Modelling Appeal Covering Note (17th June 2026) (Opens in a New Window)
- 9.04 - NCC Statement of Case (Opens in a New Window)
- 9.05 - Strategic Modelling Draft Report (17th June 2026) (Opens in a New Window)
- 9.06 - Second Case Management Conference Inspectors Note (3rd July 2026) (Opens in a New Window)
- 9.07 - Draft Section 106 Agreement (Opens in a New Window)
- 9.08 - Draft Schedule of Conditions – Track Changed (Opens in a New Window)
- 9.09 - Broxtowe Borough Council List of Conditions (Opens in a New Window)
- 9.10 - List of Neighbours and Consultees Notified (Opens in a New Window)
- 9.11 - Council Committee Report (Opens in a New Window)
- 9.12 - Council Planning Committee Minutes (Opens in a New Window)
- 9.13 - Nottinghamshire County Council Pre-Meeting Note (Opens in a New Window)
- 9.14 - Notice of Planning Inquiry and Reconsultation Letter (Opens in a New Window)
- 9.15 - Appellant Statement of Case (March 2026) (Opens in a New Window)
- 9.16 - Council Statement of Case (Opens in a New Window)
- 9.17 - National Highways Statement of Case (June 2026) (Opens in a New Window)
- 9.17.1 - (A) Appendix A NH Holding Response (June 2025) (Opens in a New Window)
- 9.17.2 - (A) Appendix B NH Holding Response (September 2025) (Opens in a New Window)
- 9.17.3 - (A) Appendix C NH Holding Response (December 2025) (Opens in a New Window)
- 9.17.4 - (A) Appendix D NH Reconsultation Response (January 2026) (Opens in a New Window)
- 9.17.5 - (A) Appendix E NH Holding Response (March 2026) (Opens in a New Window)
- 9.17.6 - (A) Appendix F NH Holding Response (May 2026) (Opens in a New Window)
- 9.18 - National Highways Written Representation to Planning Inspectorate (June 2026) (Opens in a New Window)
- 9.19 - Nottingham County Council Statement of Case (June 2026) (Opens in a New Window)
- 9.20 - Nottingham County Council Summary of Statement of Case (June 2026) (Opens in a New Window)
- 9.21 - Nottingham County Council Statement of Case Modelling Addendum (Opens in a New Window)
- 9.22 - Appellant and Council Statement of Common Ground (August 2026) (Opens in a New Window)
- 9.23 - Appellant, Nottinghamshire County Council and National Highways Statement of Common Ground (Opens in a New Window)
- 9.24 - DfT Circular 01/22 Strategic Road Network and the Delivery of Sustainable Development (Opens in a New Window)
- 9.25 - Planning for the future: A guide to working with National Highways on planning matters, October 2023 (Opens in a New Window)
- 9.26 - The Design Manual for Roads and Bridges (DMRB) GG 119 Road safety audit (Opens in a New Window)
- 9.27 - The Design Manual for Roads and Bridges (DMRB) GG 142 Walking, Cycling, Horse-riding Assessment and Review (Opens in a New Window)
- 9.28 - National Highways Planning Responses and email exchanges with appellant’s consultants (Opens in a New Window)
- 9.28.1 - (A) Appendix A NH Holding Response (June 2025) (Opens in a New Window)
- 9.28.2 - (A) Appendix B NH Holding Response (September 2025) (Opens in a New Window)
- 9.28.3 - (A) Appendix C NH Holding Response (December 2025) (Opens in a New Window)
- 9.28.4 - (A) Appendix D NH Reconsultation Response (January 2026) (Opens in a New Window)
- 9.28.5 - (A) Appendix E NH Holding Response (March 2026) (Opens in a New Window)
- 9.28.6 - (A) Appendix F NH Holding Response (May 2026) (Opens in a New Window)
- 9.28.7 - (A) Appendix G NH Response to LPA (May 2026) (Opens in a New Window)
- 9.28.8 - (A) Appendix H NH Response to LPA (June 2026) (Opens in a New Window)
- 9.29 - Broxtowe Borough Council CIL Compliance Statement (13.08.2026) (Opens in a New Window)
- 9.30 - Road Investment Strategy 3 (RIS3): 2026 to 2031 (Opens in a New Window)
- 9.31 - The Design Manual for Roads and Bridges (DMRB) GG 104 - Requirements for safety risk assessment (Opens in a New Window)
- 9.32 - Broxtowe Borough Council Strategic Housing Land Availability Assessment (SHLAA) 2025 (Opens in a New Window)
- 9.33 - The Secretary of State decision Ref: APP/K3415/V/17/3174379 - Land North of Ashby Road, Tamworth, Staffordshire B79 0BY (Opens in a New Window)
- 9.34 - Ref: 10O/2424 - Liverpool Central & Northern Docks (Bramley Moore, Nelson, Salisbury, Collingwood, Trafalgar, Clarence Graving, West Waterloo, Princes Half Tide & Princes Docks), L3 (Liverpool Waters) (Opens in a New Window)
- 9.35 - Monkhill Ltd v SSHCLG [2019] EWHC 1993 (Admin) (Opens in a New Window)
- 9.36 - Monkhill Ltd v SSHCLG [2021] EWCA Civ 74 (Opens in a New Window)
- 9.37 - Suffolk Coastal DC v Hopkins Homes Ltd [2017] UKSC 37 (Opens in a New Window)
- 9.38 - Planning Practice Guidance - Travel Plans, Transport Assessment and Statement (December 2024) (Opens in a New Window)
- 9.39 - PJA Third-Party Review of Transport Assessment on Behalf of Broxtowe Borough Council (June 2026) (Opens in a New Window)
- 9.40 - Greater Nottingham Strategic Plan Strategic Transport Assessment (July 2025) (Opens in a New Window)
- 9.41 - Greater Nottingham Strategic Plan Memorandum of Understanding Between Broxtowe Borough, Nottingham City and Rushcliffe Borough and National Highways (April 2026) (Opens in a New Window)
- 9.42 - Nottinghamshire County Council (NCC) and East Midlands Combined County Authority (EMCAA) CIL Compliance Statement (13.08.2026) (Opens in a New Window)
10. CD10 Proofs of Evidence
- 10.01 - Appellant’s Highway Planning Proof of Evidence prepared by Mode Transport Planning (August 2026) (Opens in a New Window)
- 10.02 - Appellant Planning Proof of Evidence prepared by Pegasus Group (August 2026) (Opens in a New Window)
- 10.02.1 - (A) Appellant Planning Proof of Evidence Appendix A (Opens in a New Window)
- 10.03 - Broxtowe Borough Council Proof of Evidence prepared by Darren Ottewell at Broxtowe Borough Council (Opens in a New Window)
- 10.04 - Nottinghamshire County Council and National Highways Planning Proof of Evidence prepared by Alyn Nicholls (Opens in a New Window)
- 10.05 - Nottinghamshire County Council Proof of Evidence and Appendices prepared by Jan Witko on behalf of Nottinghamshire County Council (Opens in a New Window)
- 10.06 - National Highways Proof of Evidence Final prepared by Catherine Townend (Opens in a New Window)
- 10.06.1 - (A) Appendix A NH Holding Response (June 2025) (Opens in a New Window)
- 10.06.2 - (A) Appendix B NH Holding Response (September 2025) (Opens in a New Window)
- 10.06.3 - (A) Appendix C NH Holding Response (December 2025) (Opens in a New Window)
- 10.06.4 - (A) Appendix D NH Reconsultation Response (January 2026) (Opens in a New Window)
- 10.06.5 - (A) Appendix E NH Holding Response (March 2026) (Opens in a New Window)
- 10.06.6 - (A) Appendix F NH Holding Response (May 2026) (Opens in a New Window)
- 10.06.7 - (A) Appendix G NH Response to LPA (May 2026) (Opens in a New Window)
- 10.06.8 - (A) Appendix H NH Response to LPA (June 2026) (Opens in a New Window)
- 10.06.9 - (A) Appendix I NH Written Representation to Greater Nottingham Strategic Plan (June 2026) (Opens in a New Window)
- 10.06.10 - (A) Appendix J Engagement Timeline (Opens in a New Window)
- 10.06.11 - (A) Appendix K Managing Impacts on the Strategic Road Network (Opens in a New Window)
- 10.06.12 - (A) Appendix L NH Response to Toton Chetwynd SPD (May 2026) (Opens in a New Window)
- 10.06.13 - (A) Appendix M List of Acronyms (Opens in a New Window)
- 10.07 - National Highways Proof of Evidence Summary prepared by Catherine Townend (Opens in a New Window)
- 10.08 - National Highways Proof of Evidence Rebuttal – Final (August 2026) (Opens in a New Window)
- 10.08.01 - NH Rebuttal Appendices (August 2026) (Opens in a New Window)
Contact
